Abstract

A comprehensive process lot sizing/order point model is developed, in which queuing relationships are used to endogenously model the effects of lot size on the lead time demand distribution. The model is used to examine the effect of shortage penalty on the optimal lot size, when the model reflects job queuing dynamics arising from the lot size decision. A coordinated policy of safety stock adjustment and lead time reduction through lot size adjustment is shown be more efficient than responding to changes in the shortage penalty parameter solely through adjustment of safety stock.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.