Abstract

Subway tunnels have shown characteristics of severe longitudinal differential settlement since the operation of subways in Shanghai. The differential settlement has an important impact on the internal force of tunnel structure and the waterproofing of joints. According to the in-site measuring data of Subway Line 1, subway tunnel in the soft area is easily prone to developing many settlement troughs with different sizes. The differential settlement in the settlement trough is noticeable, which has a seriously effect on the safety of tunnel structure and subway operation. The differential settlement in the settlement trough relates to the subway vibration load, the engineering activities, the regional land subsidence and the seasonal rain. From the point of view of time and space, the curve fitting and Auto Regressive Integrated Moving Average ARIMA (p, d, q) were combined to predict the long-term settlement in the settlement trough. The Hengshan Road Station and the South Huangpi Road Station were taken as case studies. The results show that the predicted values agree well with the measured data from the perspective of time and space, which provides a new idea for the long-term settlement of subway tunnel.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.