Abstract

This study concerns the long-term operation (LTO) of a boiling water reactor (BWR) reactor pressure vessel (RPV) and its internals. The main parts of this study are: survey on susceptibility to degradation mechanisms, and computational time limited ageing analyses (TLAAs). The ageing of nuclear power plants (NPPs) emphasises the need to anticipate the possible degradation mechanisms. The BWR survey on susceptibility to these uses the OL1/OL2 RPVs and significant internals as a pilot project. It is not necessary to carry out the TLAAs for all components. Some components were excluded from the TLAAs with a screening process. To do this, it was necessary to determine the component specific load induced stresses, strains and temperature distributions as well as cumulative usage factor (CUF) values. For the screened-in components, the TLAAs covered all significant time dependent degradation mechanisms. These include (but are not limited to): • irradiation embrittlement, • fatigue, • stress corrosion cracking (SCC), and • irradiation accelerated SCC (IASCC). For the components that were screened-in, the potential to brittle, ductile or other degradation was determined. Only some of the most significant cases and results are presented. According to the analysis results, the operational lifetime of the OL1/OL2 RPVs and internals can safely be extended from 40 to 60 years.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.