Abstract

With energy saving and emission reduction paid more and more attention in electric power industry, long-term optimization dispatch in wind-integrated power system must take into consideration many inconsistent factors. In this paper on the basis of comprehensive consideration of coal consumption, emissions, openness and impartiality, a long-term multi-objective fuzzy optimization dispatch model is established. The model can optimize jointly generation maintenance scheduling, unit commitment and power output. After piecewise linearization of the objectives and the constraints, the optimization model is converted to a mixed integer linear programming (MILP) problem. An efficient optimization software CPLEX is employed to solve the problem. In order to analyze and compare different generation scheduling, a series of indices and fuzzy comprehensive evaluation method are utilized to evaluate the optimal results obtained. The proposed model is tested in IEEE 118-bus system incorporating three wind farms. The results show that the optimization model and the evaluation system built are effective and feasible.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.