Abstract
This paper gives an analysis of a system withN 1 components of one type andN 2 components of another type in parallel with uninterrupted running times of each component following exponential distribution and the repair time following arbitrary distribution. The head of the line and preemptive resume priority disciplines have been imposed on the repair of the components. The busy period process is investigated first using the supplementary variable method. Then the general time dependent process in which busy periods alternate with idle periods has been studied in terms of the busy period probabilities and probability of finding the repair facility idle at timet. Finally, the long-run availability of the system in terms of the steady state probabilities for the two cases of priority disciplines has been obtained.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.