Abstract
There is a statistical linkage between tropical outgoing longwave radiation (OLR) and all-India summer monsoon rainfall (AISMR). A positive and significant correlation is observed over the surrounding areas of northeast Australia and the Arafura Sea during the months of January and February (J&F) which drops down as the lead month decreases. The OLR index as an area average over the surrounding areas of northeast Australia and the Arafura Sea is found to have 0.4 correlation with AISMR. The index is also found to be strongly correlated with the Indian monsoon index. In view of the teleconnection pattern, the OLR index is used for the development of statistical models using the concept of linear regression (LR) and canonical correlation analysis (CCA). Potential of CCA over LR is observed for the prediction of seasonal rainfall over the northwest, west central and over the whole country as well. The seasonal rainfall predictability basically comes from the months of June and September.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have