Abstract
To mitigate the effects following a large-scale nuclear or radiological material release in an urban environment and to expedite recovery, the Integrated Wash-Aid Treatment Emergency Reuse System (IWATERS) was developed. IWATERS consists of three operations: washing contaminated surfaces with an ionic wash solution, collecting, and treating the contaminated wash solution on-site to remove contaminants, and reusing the treated solution throughout operations to preserve the clean water resource. This study develops a framework to simulate the logistics of IWATERS deployment, thereby gaining an understanding of the timeline for decontamination operations. For this purpose, the Analysis of Mobility Platform and GoldSim were leveraged for a hypothetical contamination scenario covering 65,200 m2 of an urban center. The framework reveals that remediation progress is limited by several resources, notably the availability of vermiculite, a reactive clay that is required to treat the contaminated wash solution. This study also presents how the simulation approach can be used to characterize alternatives to reduce the influence of limited resources on operational progress. Overall, this work lays the foundation for evaluating different decontamination methods through detailed logistics simulation, i.e., by refining simulation assumptions and expanding the range of scenarios the simulation can depict.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.