Abstract
Logistics planning is a critical part of developing supply chain for modular integrated construction (MiC) projects in Hong Kong where high-rise, high density and hilly landscape is the norm. It is important to minimize the total logistics and to guarantee timely delivery of modules, especially for several MiC projects being constructed during the same period. Nevertheless, there is a significant lack of studies on logistics planning, optimization and visualization for MiC projects. The aim of this paper is to establish an integrated MiC logistics planning and visualization platform, which is grounded on the integration of building information modeling (BIM), geographical information system (GIS) and vehicle routing problem (VRP) algorithm. The framework is then presented and evaluated using a case study to identify optimal logistics scenario of trailer routes to meet the installation time window of MiC projects in Hong Kong. The paper finds that the proposed platform has the ability to make optimized logistics scenario for MiC projects, and to visualize the logistics scenario in a 3-dimentional interactive environment. Future study will focus on adopting flexible control strategies and including more decision-making criteria of logistics planning in MiC projects such as road width limitation, travel speed and different module types
Published Version (Free)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Modular and Offsite Construction (MOC) Summit Proceedings
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.