Abstract

Results of an international investigation concerning the selection of materials handling methods for high rise in‐situ concrete buildings by contractors’ planning engineers in France, Germany and the UK are presented. Findings indicate that materials handling methods differ in each international location. Tower cranes still dominate for high rise in‐situ concrete buildings, although contractors will also frequently utilise concrete pumps in conjunction. Company size has little impact on the materials handling method selected. Eight predominant (construction method) selection factors are identified, and ranked for each international group of contractors. Statistically, the rankings are shown to be almost the same for each country. Relative costs, speed of construction, and site safety are the principal selection criteria. Correlation analysis reveals a degree of association between the selection factors.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.