Abstract

In 2004 Logan, Utah, saw the opportunity to place a turbine within the city’s culinary water system. The turbine would reduce excess water pressure and would generate clean, low-cost electricity for the city’s residents. Federal funding was available, and the city qualified for a grant under the American Recovery and Reinvestment Act. Unfortunately, Logan City found that a complex and costly federal nexus of regulatory requirements must be met before any hydropower project can be licensed with the Federal Energy Regulatory Commission. This regulation drove up costs in terms of time and money and, as a result, Logan City is not planning to undertake any similar projects in the future. Other cities have had similar experiences to Logan’s, and we briefly explore these as well. We find that regulation is likely deterring the development of small hydropower potential across the United States, and that reform is warranted.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.