Abstract
Properly planning the modern railway logistics center is a necessary step for the railway logistics operation, which can effectively improve the railway freight service for a seamless connection between the internal and external logistic nodes. The study, from the medium level and depending on the existing railway freight stations with the railway logistics node city, focuses on the site-selection of modern railway logistics center to realize organic combination between newly built railway logistics center and existing resources. Considering the special features of modern railway logistics center, the study makes pre-selection of the existing freight stations with the DEA assessment model to get the alternative plan. And further builds a Bi-level plan model with the gross construction costs and total client expenses minimized. Finally, the example shows that the hybrid optimization algorithm combined with GA, TA, SA can solve the Bi-level programming which is a NP-hard problem and get the railway logistics center number and distribution. The result proves that our method has profound realistic significance to the development of China railway logistics.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Research Journal of Applied Sciences, Engineering and Technology
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.