Abstract

In this study, determining the location of coating defects and severities is evaluated using measurements along the Jordanian buried gas pipeline. Induced alternating current (AC) voltages and current densities along the pipeline are investigated using analytical and practical data under normal operation of the overhead transmission line. Since the induced AC voltages depend on the load currents, it is worthy to determine the actual load current during the lifetime of the pipeline. Accordingly, the forecasting of pipeline-induced AC voltages is investigated using the least square method. The investigation is carried out in order to expect the future effects on the gas pipeline. The mitigation of induced AC voltage based on inserting polarisation cells (PCs) along the pipeline is evaluated. The results show that an agreement between the measured and calculated induced AC voltages is achieved with and without PCs. Based on the forecasting of induced AC voltages and current density along the pipeline, determining the number of PCs and allocations is suggested for the future years. This study increases the lifetime of the pipeline as well as decreases the maintenance cost.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.