Abstract

It is proposed here that, for RHIC92 insertions, we remove the corrector from Q1 and the beam position monitor (BPM) from Q2 in order to alleviate difficulties associated with the physical layout of the quadrupole triplet (Q1-Q2-Q3). Furthermore, it is suggested that there should be both (horizontal and vertical) types of BPMs at each end of the free space between Q3 and Q4 and between Q7 and Q8 so that one can measure the direction of the closed orbit. With this model, a localized control of the beam position and angle at the interaction point (IP) with either four or six correctors has been investigated. Similarly, a control of the orbit within an insertion for minimizing the orbit displacement at seven (or eight) BPM locations with nine (or ten) correctors in each transverse direction has been studied. Examples are given for the beta at IP = 2m, 10m, 20m, and 200m. It is shown that the design value of the integrated field strength of 0.3 T-m for each corrector should be sufficient for the tasks considered here except for some cases with the extreme parameter values. At the same time, it is emphasized that the overall correction of the closed orbit for the entire ring (arcs and insertions) should be re-examined for RHIC92 lattice with the proposed arrangement of correctors and BPMs.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call