Abstract
Although different kinds of foundations have been investigated against an earthquake faulting, the interaction between pile group and dip–slip fault has not yet been fully understood. This paper investigates the interaction between piled raft and normal faulting by means of centrifuge and numerical modelling. In centrifuge test, a piled raft was simulated with a half model for a better observation of fault rupture path under the raft. The loading transfer mechanism was further examined using a three-dimensional finite difference software. The measured and computed results showed that the piled raft displaced and tilted linearly with the magnitude of faulting. The fault rupture bifurcated into two and diverted towards both edges of the raft. Two types of loading transfer mechanism were identified during faulting. Working load transferred from the raft to the underneath piles, and also from the piles on the side of the hanging wall to the piles on the footwall side, resulting in compression failure of the piles on the footwall side.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.