Abstract

This paper presents a load shedding method for power systems with high integration of wind energy, considering their frequency response. The minimum load shedding power needed to restore system frequency to operational limits can be determined by using the modified frequency response model along with secondary frequency control. The voltage electrical distance method can then be applied to appropriately distribute the shedding power to load buses. This method brings selectivity to the problem and minimizes the impact caused by load shedding. The proposed method was validated using simulations on the IEEE 37-bus test system with a modified wind power generator model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.