Abstract

The service restoration of medium voltage distribution networks considering load reallocation in the substation areas that are topological neighbors to de-energized area is presented in this paper. The heuristic graph-based approach based on Prim's algorithm for finding the minimum spanning tree logic is implemented in the service restoration application. Primary objective of the proposed service restoration application is the minimization of the unsupplied load to consumers in de-energised area. Secondary objective is the reduction of the number of switching operations. The approach for the reduction of the number of switching operations is based on the assignment of the weighting coefficient to branches in a de-energized area. Key improvement with the proposed algorithm is achieved by the introduction of the load reallocation consideration during service restoration calculations. The load reallocation significantly improves the fulfilling of the primary objective i.e. the number of consumers in de-energised area that shall have restored service shall be significantly increased.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.