Abstract
This paper presents a new time-domain multi-objective function approach for solving load frequency control issue in an interconnected power system. The performance of interconnected power system in each area is validated for overshoot and settling time values of frequency change and tie-line power exchange. An objective function is created with the goal of enhancing proportional integral derivative (PID) controller settings by reducing overshoot and achieving faster time-domain settling times. The efficiency of the proposed time-domain multi-objective function is evaluated in a two-area thermal power plant using a nature-inspired cuckoo search optimization (CSA) technique. By comparing the time-domain simulation results of the test system with the existing integral error-based objective functions IAE, ISE, ITAE, and ITSE, the proposed objective function is validated. Further, a sensitivity analysis were carried out to analyze the robustness of the proposed multi-objective function under various uncertain conditions.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Bulletin of Electrical Engineering and Informatics
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.