Abstract
The variable and uncertain nature of the leading renewable energy resources, such as wind power generation, imposes the development of a sophisticated balance mechanism between supply and demand to maintain the consistency of a power system. In this study, a two stage stochastic programming model is proposed to procure the required load-following reserves from both generation and demand side resources under high wind power penetration. Besides, a novel load model is introduced to procure flexible reserves from industrial clients. Load following reserves from load serving entities (LSE) are also taken into account as well as network constraints, load shedding and wind spillage. The proposed methodology is applied to an illustrative test system, as well as to a 24-node system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.