Abstract

With the rapid development of large-scale distributed renewable energy in China, the load factor of distribution transformer increases year by year, this directly become a new challenge to the load capacity of the transformer. Once subjected to this condition for a long time will have an impact on the hotspot temperature and consequently, the useful life of the transformer. In this regard, load capacity assessment of the distribution transformer becomes an essential work for unit upgrading or even replacement. This article systematically summarized the evaluation methods of transformer load capacity, as well as the load capacity prediction and dynamic capacity enhancement strategies of transformer. Discussions for the future work regarding this topic are also carried out.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.