Abstract

ABSTRACTWe study Swedish implementation of the European Union’s Water Framework Directive, and compare the current implementation strategy with more flexible ‘bubble’ schemes, where measures can be traded among various locations within the same river system to reach the overall environmental target. Two different Swedish river systems, the Mörrum system with small-scale hydropower plants, and the Ångerman system with larger plants, are studied. We find that the environmental benefits that current policies are likely to accomplish could be achieved at well under half the cost in the Mörrum system, and at less than a tenth of the cost in the Ångerman system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.