Abstract
The authors consider the concept of liquid blockage in a gas wellbore and how it can be prevented by adequately predicting the fluid mixtures' (gas, oil, water and condensates) behavior as it travels along the wellbore to the surface using the IPM packages MBAL, PROSPER, and GAP to model the flowrate and tubing size performance. The central objective of the modeling work was to determine the best tubing size needed for optimum delivery of the gas well in focus. The results from the analysis show 0.1397 m (5.500″) tubing as the best size for flowing the gas well.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.