Abstract

One of the blasting process effect is ground vibration. Ground vibration currently consider as waste energy which it can infere and be an issue to the environment. PT. Multi Nitrotama Kimia as blasting service and explosives sales in Indonesia has customers dealing with that issues, one of them is PT Adaro Indonesia. To overcome the issue, engineering approach is done to the ground vibration by changing waste energy into work energy with the principle of linear superposition using the signature hole analysis (SHA) method to minimize the ground vibration. Researches and experiments are carried out using the Signature Hole Analysis (SHA) method to record wave propagation in each range of certain blocks - strips to the concern area. The recorded waves are analyzed with the Linear Superposition feature to obtain delay time recommendation along with the predicted vibration. The recommended delay time obtained is the delay time on inter-hole and inter-row which will be applied for next blasting.Based on the Signature Hole Analysis method, the recommended delay time given can be applied to accommodate the linear superposition wave principle. Its application can be optimized using inter-deck delay to minimize ground vibration produced. Its proven by ground vibrations produced using the recommendations always below the specified standard (PVS = <2.00 mm / s).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.