Abstract
For the r-stage open shop problem with identical parallel machines at each stage and the minimum makespan criterion, an approximation scheme is constructed with running time O( nrm+ C( m, ε)), where n is the number of jobs, m is the total number of machines, and C( m, ε) is a function independent of n.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.