Abstract

We verify all quadrupole strengths (both normal and skew) and determine sextupole feed-downs as well as all BPM gains and BPM cross-plane couplings by an SVD-enhanced least-squares fitting of the phase advances (only those which are accurately determined) and the Green's functions (specified by the local transfer matrix components R12, R34, R32, and R14). The phase advances and the Green's functions are obtained by analyzing turn-by-turn Beam Position Monitor (BPM) data from high-resolution model-independent analysis (MIA). Once the magnet strengths are verified, a magnet correction priority sequence can be exercised in the computer before one tries to correct the real accelerator. Results from PEP-II LER measurement are presented.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call