Based on forward-analysis method, the deformation of structure during each construction stage is calculated and accumulated for the request of linear control of long-span prestressed concrete continuous girder bridge constructing by cast-in-place cantilever method. Then the camber is determined considering some more factors, such as concrete shrinkage and creep, secondary permanent load, a half of static live load, etc. The points of linear control of long-span prestressed concrete continuous girder bridge are also summarized, which constructed by cast-in-place cantilever method. The line shape of whole structure was controlled well according to the result of elevation association survey before closure, the deviation is limited within the confine provided by code, which is important to the closure of bridge. This paper would provide reference value for linear control of the same type of bridges.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.