Abstract
Mixed-model U-lines (MMULs) are important elements of just-in-time production systems. For successful implementation of MMULs, a smoothed workload distribution among workstations is important. This requires that line balancing and model sequencing problems are solved simultaneously. This article presents a mixed, zero–one, nonlinear mathematical programming formulation for balancing and sequencing MMULs simultaneously with the objective of reducing work overload. Since the problem is NP-hard, an effective simulated annealing approach is also presented and its performance compared with existing approaches. The results show that the proposed simulated annealing algorithm outperforms existing approaches.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.