Abstract
Fabricating an interim screw-retained prosthesis often involves obliteration of the abutment screw access site, which later must be exposed. This frequently results in excessive preparation of the screw access site with poor esthetics and a weaker restoration. The technique described expedites the process by locating the access site and limits the size of the screw access hole preparation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.