Abstract

The researches of project management almost focus on the critical paths. However, there are few researches on the limited resources based on the critical paths. This paper gets the processes of the limited resources distributions based on the critical paths and sets a proposal for distributions of the limited resources. It introduces a penalty function to solve the limited resources distribution of the uncritical paths as a quantitative method. There is an example to show the use of the method and relevant measures to make sure the Time or minimize the impact to the Time. This method can solve the problem of the limited resources distributions in small corporations, which has practical values.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.