Abstract

For economy, the traditional lightning protection method is simple and the lightning protection effect is unsatisfactory. With China’s call and demand for energy transformation, a new distribution network based on “Generation-Grid-Load-Storage” will be the general direction of China’s distribution network development. The new distribution network puts forward higher requirements for the stability, and its lightning protection problem must be solved. In this paper, the overhead ground wire is proposed as the main lightning protection measure of the new distribution network, and the optimal erection range of the overhead ground wire of the distribution line is proposed through simulation, which can effectively reduce the amplitude of lightning overvoltage by 24.1%, which provides an application reference for the lightning protection concept of the new distribution line in the future.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.