Abstract

WORK on the effects of showers on droughted maize necessitated measurement of water run-off down the main stems. The following two collecting devices have proved simple to construct and reliable in use. They are attached directly to the stem 1–3 in. above the ground-surface after the leaf-bases ensheathing the first internode have been removed, and the stem surface dried.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.