Abstract
Rainflow algorithms are one of the best counting methods used in fatigue and failure analysis [17]. There have been many approaches to the rainflow algorithm, some proposing modifications. Graphical Rainflow Method (GRM) was proposed recently with a claim of faster execution times [10]. However, the steps of the graphical method of rainflow algorithm, when implemented, do not generate the same output as the four-point or ASTM standard algorithm. A modified graphical method is presented and discussed in this paper to overcome the shortcomings of graphical rainflow algorithm. A fast rainflow algorithm based on four-point algorithm but considering point comparison than range comparison is also presented. A comparison between the performances of the common rainflow algorithms [6-10], including the proposed methods, in terms of execution time, memory used, and efficiency, complexity, and load sequences is presented. Finally, the rainflow algorithm is applied to temperature data of an IGBT in assessing the lifetime of a STATCOM operating for power factor correction of the load. From 5-minute data load profiles available, the lifetime is estimated to be at 3.4 years.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.