Abstract
The tailings accident-prone and the method of hazards analysis and identification are highly valued by Canada, Australia, European Union and other countries. These accidents brought huge loss and a profound lesson such as the “9.8” dam break accident of Shan Xi's new tower, which reflected the limitations of our tailings management and the necessity of study. A method about Life cycle oriented hazards identification for tailings facility, and analyzed hazards of life cycle systematically from technical, human, environment and regulations, such as the unsafe state of tailings pond, the miscount of people, the deficiencies of management and the adverse conditions of environment, and the advice of accident disaster prevention measures for the corresponding life cycle stages was presented, the safety level of the tailing pond in China will be improved.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.