Abstract

As an important long-term task in the field of dam engineering, the maintenance and reinforcement (MAR) are of great significance for ensuring the safety of the project and prolonging the service period of the project. The MAR of large-scale and long-term projects also requires high costs. In order to reduce the consumption of funds and improve the utilisation of resources, the whole life cycle cost (LCC) method is introduced. Aiming at the lowest total cost in the whole life cycle, the optimisation of dam engineering planning, design and MAR is carried out. Taking gravity dam as an example, this article establishes a time-varying model of structural resistance and load effect, and the deterioration process of the gravity dam has been analysed and predicted. A decision model for design and reinforcement of gravity dams considering operational risk and LCC is established. Through the optimisation algorithm, the optimal initial design of the gravity dam and its optimal MAR plan is obtained.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call