Abstract

The current built stock in Europe is large and energetically inefficient due to material decay caused by lifelong use and lack of maintenance, combined. New buildings are commissioned and delivered everyday with an environmental cost, calculated using the Life Cycle Assessment methodology. The LCA is now widely requested for new assets, while existing ones are left for demolition and consequent carbon emissions released into the atmosphere, increasing the environmental crisis. In an effort to increase built stock’s energy efficiency rates and decrease carbon emission, the recovery of these assets is depicted as the strategic next step for the construction sector. Both goals are achieved using data generated by dedicated construction software and processed in Calculation Virtual Environment, according to the specific needed data. The use of BIM for refurbishment design projects allows virtual construction separated by phases to simulate existing conditions of the envelope and its improvement with insulation material options. The use of one single file with clear phase definitions ensures data extraction and transference for all material options. The process is not entirely automated nevertheless it allows to save, use and share data whenever needed. The connection between data sources and databases in the cloud provides timesaving and regular updates. The research findings demonstrate the positive outcomes of modeling existing structures for energy simulation oriented to use in LCA, increasing the potential of BIM use in sensitive constructions while delivering appropriate results based on model and enriched geometry, with cost evaluation potential enabling scenario comparison for better decision making.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call