Abstract

This paper presents a comparative life cycle assessment (LCA) of an existing digested sewage sludge incineration for heat and power production. Operations of an existing sewage sludge incineration plant based on a fluidized bed combustor (FBC) and a hypothetical cement kiln (CK) facility using sludge as a secondary fuel are described in detail as two different scenarios. The comparison of these two scenarios is performed based on 15 impact categories in the characterization stage. The results show that the sewage sludge incineration scenario based on FBC has a better environmental performance in the most of the impact categories including global warming, respiratory organic and inorganic, aquatic and terrestrial ecotoxicity, terrestrial acidification/nutrition, aquatic acidification, land occupation, and mineral extraction. In the human health category, the scores of the CK scenario precedes the scores of FBC scenario because the residual materials of the incineration in the cement kiln are immobilized with the produced clinkers whereas in the FBC system, they are landfilled. This study aims to show the environmental burdens of each option based on different impact categories in order to give a clear perspective to decision makers for drawing an environmentally friendly and sustainable sludge disposal policy.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.