For nominal beam parameters at 7 TeV/c each of the two LHC proton beams has a stored energy of 362 MJ threatening to damage accelerator equipment in case of uncontrolled beam loss. The energy stored in the magnet system at 7 TeV/c will exceed 10 GJ. In order to avoid damage of accelerator equipment, complex machine protection systems are required. Magnet protection and powering interlock systems must be operational already before commissioning the magnet powering system. Beam operation, throughout the operational cycle from injection to colliding beams, requires fully operational protection systems, including beam interlock systems, beam dumping system, beam instrumentation (mainly beam loss monitors) as well as collimators and beam absorbers. Details of LHC machine protection have been presented on several occasions and the systems involved in protection are well documented. This paper gives an overview of LHC machine protection, discusses the progress with the implementation and presents first results from the commissioning of some systems.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call