Abstract
The DOT (Double-O-Tube) tunnelling method has been adopted in the construction of various types of tunnels in soft ground both in Japan and in China. Recently, an unexpected ground surface settlement of approximately 0.8m was observed in a DOT construction site in Shanghai, China. The backfill grouting injection rate had to be increased by up to 500% to control the settlement. In order to find out the reasons for the large settlement, and to reduce it to an acceptable level, in-situ monitoring, including surface settlement and subsurface settlement, was undertaken to obtain the change in ground deformation during DOT machine driving. It was found that the conventional settlement control methods, such as adjusting the earth pressure balance on the cutter face, and simultaneous backfill grouting at a normally acceptable injection rate, could not reduce the large settlement. It was also noticed that the settlement started as the DOT machine was passing, as well as after the tail had passed through. Subsequent field investigations found cement accumulation attaching to the skin plate. This was due to improper backfill grouting at the early construction stage, and the concave shape of the DOT machine. The mechanism for large settlements due to improper immediate backfill grouting was analysed. After taking countermeasures, the ground settlement was reduced to approximately 0.02m.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.