Abstract

The DOT (Double-O-Tube) tunnelling method has been adopted in the construction of various types of tunnels in soft ground both in Japan and in China. Recently, an unexpected ground surface settlement of approximately 0.8m was observed in a DOT construction site in Shanghai, China. The backfill grouting injection rate had to be increased by up to 500% to control the settlement. In order to find out the reasons for the large settlement, and to reduce it to an acceptable level, in-situ monitoring, including surface settlement and subsurface settlement, was undertaken to obtain the change in ground deformation during DOT machine driving. It was found that the conventional settlement control methods, such as adjusting the earth pressure balance on the cutter face, and simultaneous backfill grouting at a normally acceptable injection rate, could not reduce the large settlement. It was also noticed that the settlement started as the DOT machine was passing, as well as after the tail had passed through. Subsequent field investigations found cement accumulation attaching to the skin plate. This was due to improper backfill grouting at the early construction stage, and the concave shape of the DOT machine. The mechanism for large settlements due to improper immediate backfill grouting was analysed. After taking countermeasures, the ground settlement was reduced to approximately 0.02m.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call