Abstract
A 14.5-km (9-mi) stretch of the North Central Expressway in Dallas, Texas, was reconstructed to increase capacity and improve the geometric design of the freeway. The decade-long reconstruction project is considered by many industry experts to be one of the most complex ever undertaken by the Texas Department of Transportation. Much was learned concerning constructibility of urban freeway reconstruction projects, presenting the opportunity to document lessons and store them in an electronic format. A relational database using Microsoft Access was created to classify and store the lessons for easy retrieval and distribution.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Transportation Research Record: Journal of the Transportation Research Board
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.