Abstract

The present paper presents how the flood directive has been implemented on the Seine and coastal rivers of Normandy basin. It presents the various steps and details the elaboration of the basin flood risk management plan (PGRI). Though out of the scope of the present paper, the new responsibility in term of flood prevention given to local authorities will be briefly introduced and discussed with reference to the implementation of the flood directive.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.