The construction phases of large dam and infrastructural projects often extend over long periods of time, creating social, environmental, cultural, political, and economic consequences in the proximate communities and landscapes. The temporality of the phases of the project – from planning to construction to post-construction – reveal more layered and wide-ranging consequences from the social and environmental changes that result, sharpened by greater attention to how these changes unfold across multiple timescales and sites of the project. Using the case study of the Lesotho Highlands Water Project (LHWP), I draw on a political ecology approach that uses longitudinal data, including interviews, document analysis, and ethnographic fieldwork conducted in Lesotho since 1997, to illustrate how active project narratives draw from and promulgate an affective economy of anticipation in ways that aim to both sustain the hope of people affected by the project and contain their criticism of the project amidst a continued investment by the state in the expansion of the LHWP. As people directly affected experience disjunctures between the promises and the realities of the project over time, subsequent phases of the project are simultaneously renewed and recast through a logic of improvement that emphasizes changes in the implementation of the project while continuing to invest in the future imaginary of development that requires going forward with project plans. A logic of continuity and improvement structures this continued commitment to the capital intensive LHWP through the strategic mobilization of phases that scaffold both the material and physical dimensions of the project, but also the affective and anticipatory hopes of prosperity that the project represents. In this case, it also reveals how project authorities weave these dimensions – the material and the aspirational – into specific planned changes and improvements to address previous and ongoing concerns as projects progress over time. This longitudinal approach demonstrates the importance of temporal and affective dimensions to our understanding of the complex, multi-faceted consequences of resource extractive mega-dam projects such as the LHWP, particularly as they further rationalize the resource extractive approach to economic development in the region.Keywords: development, dams, infrastructure, political ecology, temporality, affect, resource extraction, economy of anticipation, displacement, construction, Lesotho, Southern Africa

Highlights

  • The construction phases of large dam and infrastructural projects often extend over long periods of time, creating social, environmental, cultural, political, and economic consequences in the proximate communities and landscapes

  • These affective dimensions of large-scale projects and their relationship to temporality are underexplored in studies of resource extraction and development, and I explore these here through a case study of the Lesotho Highlands Water Project (LHWP), a transnational water scheme between South Africa and Lesotho

  • I draw on a political ecology approach that uses longitudinal data, including interviews, document analysis, and ethnographic fieldwork conducted in Lesotho since 1997, to illustrate how active project narratives draw from and promulgate the affective economy of anticipation in ways that aim to both sustain hope and contain criticism of the project over time

Read more

Summary

Introduction

The construction phases of large dam and infrastructural projects often extend over long periods of time, creating social, environmental, cultural, political, and economic consequences in the proximate communities and landscapes. In large-scale projects with multiple phases, the logic of improvement and economy of anticipation are hinged to the necessity of subsequent phases to realize the project's potential, even if earlier phases have had problems or have not achieved expected results These affective dimensions of large-scale projects and their relationship to temporality are underexplored in studies of resource extraction and development, and I explore these here through a case study of the Lesotho Highlands Water Project (LHWP), a transnational water scheme between South Africa and Lesotho. I draw on a political ecology approach that uses longitudinal data, including interviews, document analysis, and ethnographic fieldwork conducted in Lesotho since 1997, to illustrate how active project narratives draw from and promulgate the affective economy of anticipation in ways that aim to both sustain hope and contain criticism of the project over time This longitudinal approach demonstrates the importance of temporal and affective dimensions to our understanding of the complex, multi-faceted consequences of resource extractive mega-dam projects such as the LHWP. As large dams continue to be built in the developing world, and at a faster rate than any other time, and as large dams are re-cast as carbon-low, green energy solutions in the era of climate change (Bromber et al 2014), this research extends important theoretical and empirical insights to better capture how the social and environmental costs of these mega-projects unfold dynamically over time, in place, and in relation to the anticipatory aspirations attached to resource extraction and development

Literature review
Research context
Method and methodology
Conclusion
Findings
Background
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call