Abstract

The project of the Low Energy Positron Toroidal Accumulator (LEPTA) is under development at JINR. The LEPTA facility is a small positron storage ring equipped with the electron cooling system. The project positron energy is of 2 ' 10 keV. The main goal of the facility is to generate an intense flux of positronium atoms ' the bound state of electron and positron. Storage ring of LEPTA facility was commissioned in September 2004 and is under development up to now. The positron injector has been constructed in 2005 / 2010, and beam transfer channel ' in 2011. By the end of August 2011 the experiments on injection into the ring of electrons and positrons stored in the trap were carried out. In 2012 - 2015, the LEPTA trap optimization and new experiments on accumulation of electrons and positrons in the trap has been performed. Furthermore new cooler for positrons source has been designed and manufactured, its assembling is in progress. The recent results are presented here.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call