Abstract

Completed in 2016, the Lee tunnel is the largest-diameter and deepest tunnel ever built in London. The 6·9 km long, 7·2 m dia., 80 m deep storage tunnel for combined stormwater and sewage was also Thames Water’s largest ever infrastructure project. The tunnel has already cut combined sewage and stormwater overflows from London into the Thames by over 40%. In 2023 it will carry nearly all of the capital’s overflows when the £4·2 billion Thames Tideway tunnel connects into it. This paper describes the design and construction of the award-winning project. Innovations included steel-fibre-reinforced concrete slip-formed shaft linings, launching a tunnel-boring machine from a shaft without a back-shunt, full-round shuttered secondary tunnel linings and water-cooled pump motors.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.