Abstract

Reducing the lead time for engineered‐to‐order products can allow more time for exploration and testing of design alternatives, reduction of project durations, or some combination of both. Combined with improved reliability of work flow on site, more fabricated products can be pulled to site when needed, thus avoiding unnecessary inventories. Lead time reduction benefits both the design and the construction phases of projects, and it benefits the fabricator as well. Integration of engineering and detailing may offer the greatest potential for lead time reduction. However, fabrication lead times can also be reduced. This paper describes the application of lean production concepts and techniques to structural precast concrete fabrication. The key change was learning to identify and utilise work flow as opposed to focusing management effort on keeping workers and plant busy. Results included shop cycle time and lead time reduction, increased throughput rate, and improved productivity.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.