Abstract

In the nuclear sector, turnkey projects can be considered an investment in obtaining information through “learning by doing” to capture rents from the next generation of reactors. As the first U.S. turnkey export project, the first Spanish nuclear power plant served that purpose and paved the way for the subsequent growth of the nuclear sector, for both Spanish and U.S. firms. Making use of archival material, we analyze the networks created by the government, experts, and business leaders, which sought to obtain, accumulate, and learn from the scarce and conflicting information about atomic technology that was available at the time. We also discern how firms on both sides of the Atlantic acquired and perfected the specific capabilities required to build a commercial nuclear reactor.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.