Abstract

TYAD repairs and refurbishes a variety of Department of Defense systems that are essential for our military effectiveness and daily operations. Employees at TYAD have noticed a tall number of overrun hours for projects in their small component paint branch. These high number of overrun hours have led to TYAD steadily losing revenue and profitability on their projects. This capstone group utilized Lean Six Sigma’s (LSS) DMAIC (Define, Measure, Analyze, Improve, and Control) process to decrease the number of overrun hours experienced and hopefully allow a way for greater throughput to go through the system. The efforts of this group led to discoveries of issues with the implementation of quality control tools. Our discoveries led to a revamped quality control protocol that will decrease the number of overrun hours experienced by TYAD and ultimately save them an estimated $478,000.00 over the course of the next three years.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.