Abstract

to describe the Lean Six Sigma implementation process to improve the discharge process in a Brazilian health institution's ICU. prospective study following the Define-Measure-Analyse-Improve-Control project development method. This method consists of five phases, namely: project definition, measurement of the starting point and data collection, analysis of results, improvement in processes, and statistical control. applying Lean Six Sigma methodology following the Define-Measure-Analyse-Improve-Control in the discharge process from the intensive care unit to the inpatient unit was effective in improving processes. This improvement represented a reduction in the mean patient transfer time to the inpatient unit from 189 minutes to 75 minutes, representing a 61% improvement in discharge time. this article demonstrates the effectiveness of applying Lean Six Sigma methodology to improve the discharge flow in a critical unit, resulting in time and waste reduction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.