Abstract

The Lean Project Delivery System emerged in 2000 from theoretical and practical investigations, and is in process of on-going development through experimentation in many parts of the world. In recent years, experiments have focused on the definition and design phase of projects, applying concepts and methods drawn from the Toyota Product Development System, most especially target costing and set based design. These have been adapted for use in the construction industry and integrated with computer modeling and relational forms of contract. Although by no means a finished work, the Lean Project Delivery System has developed sufficiently to warrant an updated description and presentation to industry and academia, incorporating processes and practices that have emerged since earlier publications.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.