Abstract

The current focus of modern manufacturing is to convert the raw material to the finished goods with zero wastage and at least-cost. Lean manufacturing approach is considered as a successful strategy that minimises the non-value added activities (waste). Value stream mapping (VSM) is one of the tools in lean manufacturing to understand the value added and non-value added activities in the entire system. Such approach has not been explicitly practiced in wet grinder manufacturing system. An attempt has been made in this paper to systematically evaluate current state mapping (CSM) and implement future state mapping (FSM) in a wet grinder manufacturing system. CSM describes the present VSM and other activities that influence it. CSM has been developed by careful observation of cycle time, change over time and non-value added activities. The objective of this study is to minimise the non-value added activities and achieve the required TAKT time. The FSM is arrived by incorporating various improvements in the assembly line.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.