Abstract

ABSTRACT Construction submittals are items that the contractor sends to the project engineer in the construction field office for review and approval. Problems arise when the construction schedule is negatively impacted because submittals are either received late, incomplete, or deficient from the contractor. A lean tool, value stream mapping (VSM), and various other lean concepts were used to analyze the submittal review process for a typical levee construction project. Through the application of lean concepts, measurable savings in process and lead times are obtainable by reducing or eliminating nonvalue activities.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.