Abstract

The development of prefabricated construction in China has encountered challenges that prevent it from fully realizing its potential advantages. To overcome the challenges, this research examines the implementation of lean construction management in prefabricated building projects as a strategic approach to enhance their performance. Initially, this study examines the casual links between the driving factors of lean construction management and the performance indicators in prefabricated buildings by employing a structural equation model. Moreover, a fuzzy comprehensive evaluation method is used to assess the performance of a selected prefabricated building across the four dimensions: project schedule, quality, cost and safety. Furthermore, through the analysis and research above, this paper proposes a performance enhancement path for prefabricated building projects based on the key driving factors of lean construction management. The research identifies 23 driving factors and 16 performance indicators. 13 key driving factors are identified, including (1) accurate positioning and lean evaluation of the project, (2) identification of project product market demand, (3) modular collaborative design of the project implementation plan, (4) component production plant standardization, (5) production procurement costs reduction, (6) distance and cost of component transportation reduction, (7) lean transportation program plan, (8) construction and assembly costs reduction and waste elimination, (9) modular parallel construction, (10) lean construction assembly technology and management technology, (11) internal performance incentive mechanism of the project organization, (12) lean culture cultivation and lean management training, and (13) support from senior management. In addition, this research proposes a performance enhancement path for prefabricated buildings. The findings contribute to the theoretical knowledge of lean construction management in prefabricated building projects and offer valuable guidance for its practical implementation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.